12 - 13 February 2018 | Amsterdam, The Netherlands

Adeel Younus Memon


Senior Contracts Administrator
China Petroleum Engg. & Const. Corporation


3:00 PM BALANCING COST EFFECTIVENESS WITH PERFORMANCE

  • Understanding the critical risks–failure modes, actions, and consequences of failure associated with a system
  • Mathematical and statistical concepts required for data-driven model construction
  • How to align model output with strategic priorities such as maintenance costs, spare holding levels, and risk of unplanned system downtime


Check out the incredible speaker line-up to see who will be joining Adeel.

Download The Latest Agenda